The Wind Energy Pioneers: The Gedser Wind Turbine
The Gedser Wind Turbine - © the Electricity Museum, Bjerringbro

The Wind Energy Pioneers: The Gedser Wind Turbine

Johannes Juul and the Vester Egesborg Turbines

The engineer Johannes Juul was one of the first students of Poul La Cour in his courses for "Wind Electricians" in 1904.

In the 1950s J. Juul became a pioneer in developing the world's first alternating current (AC) wind turbines at Vester Egesborg, Denmark.

No alt text provided for this image


The Gedser Wind Turbine

Gedser is a good, windy area located at the southern tip of the island of Falster in Denmark.The concrete tower of the Gedser turbine is still there after 50 years, although it is now equipped with a modern Danish wind turbine nacelle.

The innovative 200 kW Gedser wind turbine was built in 1956-57 by J. Juul for the electricity company SEAS at Gedser coast in the Southern part of Denmark.

The three-bladed upwind turbine with electromechanical yawing and an asynchronous generator was a pioneering design for modern wind turbines, although its rotor with guy wires looks a bit old fashioned today.

The turbine was stall controlled, and J. Juul invented the emergency aerodynamic tip brakes which were released by the centrifugal force in case of over speed. Basically the same system is used today on modern stall controlled turbines. The turbine, which for many years was the world's largest, was incredibly durable. It ran for 11 years without maintenance.

No alt text provided for this image

The Gedser wind turbine was refurbished in 1975 at the request of NASA which wanted measurement results from the turbine for the new U.S. wind energy programme.

The machine ran for a few years with test measurements after which it was dismantled. The nacelle and rotor of the turbine are now on display the Electricity Museum at Bjerringbro, Denmark.

(Photographs © the Electricity Museum, Bjerringbro).

The Nibe Turbines

After the first oil crisis in 1973, interest in wind energy rekindled in several countries. In Denmark, the power companies immediately aimed at making large turbines, just like their counterparts in Germany, Sweden, the UK, and the USA.

In 1979 they built two 630 kW wind turbines, one pitch controlled, and one stall controlled . In many ways they suffered the same fate as their even larger colleagues abroad: The turbines became extremely expensive, and the high energy price subsequently became a key argument against wind energy.


© Copyright 1997-2003 Danish Wind Industry Association

http://drømstørre.dk/wp-content/wind/miller/windpower%20web/en/pictures/juul.htm

Al Finnell

CEO Tension Turbine Inc.

1y

The Tension Turbine provides twice the power of any equal size three blade unit. The Tension Turbine has a work life of about 50 years. The Tension Turbine uses no carbon fiber and is completely recyclable materials. The Tension Turbine has ZERO bird kill. The Tension Turbine has been proven to capable of 525 Feet diameter! Bigger is better!

Like
Reply
Emmanuel Guillot

Deputy Director PROMES-CNRS — Solar Infrastructure

2y

Thnaks Giorgi for sharing this piece of history 🙂

Like
Reply

To view or add a comment, sign in

Insights from the community

Others also viewed

Explore topics